Specifications include, but are not limited to: The typical work scope would include the following items. 2.1.1. Iowa State University staff shall remove the pump from service and prepare it for pickup and transportation from Owner to the Contractor’s repair facility. 2.1.2. Disassembly to include wear and dimensional measurements of pump component parts. 2.1.3. Cleaning and inspection. Inspection shall include digital photos which can be used in the repair report. 2.1.4. Replacement of normal wear components which shall include but not be limited to: wear rings, shaft sleeves, bearings, gaskets, etc. 2.1.5. Replacement of mechanical seals in kind or better (packing will be done by Owner). 2.1.6. The pump rotor shall be precision dynamic balanced to meet or exceed the balancing standard used by the Contractor. (Contractor shall provide the balancing standards they use as a part of the bid response