Loading...
Skip to main content
< Back to results

Permeable Paver Maintenance


Location
Iowa
Publication Date
08/05/2019 08:44 AM EDT
Closing Date
08/16/2019 04:00 PM EDT
Issuing Organization
City of Cedar Rapids
Solicitation Number
Description

Specifications include, but are not limited to: 4.2.1 Contractor shall provide semi-annual maintenance of the permeable pavers at both locations, once in the spring and once in the fall. 4.2.2 Contractor shall coordinate all work with Project Manager, Mikayla Goemaat. Date and time shall be approved by the Project Manager at least 2 weeks in advance. 4.2.3 Contractor shall reference Attachment D for map of the locations. 4.2.4 Coe College Alley located between D Ave and E Ave NE and 14th St and College Dr NE a) Alley is constructed of a Pave-Drain system and must be vacuumed out with a Pave Drain vacuum head or Elgin Whirlwind. b) Contractor shall remove and dispose of sediment including sand, silt, and debris from between pavers.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids