This project is located at 725 E 13th St, Ames, IA 50010 (North River Valley Park). As old wells fail and need to be replaced and as demand for treated water increases, additional wells must be drilled. This project will provide new and replacement source water capacity with the addition of three new water supply wells and interconnecting pipeline to the Ames Water Treatment Plant. This project will consist of a new emergency generator located at Inis Grove Park, along with new electrical power transmitted to the well site from Inis Grove Park. Fiber optic communication will be conveyed from the Ames Water Treatment Plant to the new well field for well controls and security cameras. In addition, a new security gate at the Water Pollution Control Lime Ponds will be include in the scope of this project.