Specifications include, but are not limited to: Project involves abandonment of 1930's sanitary interceptor and rerouting of sanitary sewer connecting sub-lines to the newer 78" sanitary interceptor built in the 1970's. The project includes rerouting and constructing approximately 3,800 LF of sanitary sewer ranging from 8" to 60" in diameter, augor boring 177 LF of sanitary sewer, 593 LF of sanitary sewer service, CIPP lining 767 LF of sanitary, replacement of 676 LF of storm piping, 37 sanitary manholes, 14 special sanitary structures built over 78" interceptor, 16 replaced storm intake/manholes, and 1 storm gate structure. Work includes excavation and backfilling to existing grade elevations as well as surface restoration and miscellaneous associated work, including cleanup.