Specifications include, but are not limited to: provide design, bidding, and construction administrative services for the repair/replacement of approximately 650’ of utility tunnel at the Glenwood Resource Center (GRC) Powerhouse; 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 Design for approximately 650’ of repair/replacement of the Lacey Street Tunnel. Tunnel corrections may include replacement, repair, waterproofing, landscaping, etc.