Specifications include, but are not limited to: Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 Design for the Water Main: Design shall include evaluation and design for replacement of approximately 900’ of water main for the Glenwood Resource Center. Existing water main is currently located on the west side of the GRC Power Plant and runs west to connect to city water. Design shall include services to provide design for new water main and all associated excavating, demolition, paving, seed, sod, routing, sizing, valving, connections, etc. for a complete system. Routing of the new water main shall include alternative pathway (if applicable) to minimize disturbance to existing utilities, structures, and infrastructure. Design shall coordinate with the City of Glenwood for connection requirements to the existing city water main.