Specifications include, but are not limited to: The Fiber Conduit Inter-connect project (Purple Route & Duct Bank) includes installation of one 6-way multi-duct conduit, two 2” conduits and one 7-way multi-duct conduit, structures and surface restoration along the Veterans Parkway and Iowa Highway 5 corridors in the City of West Des Moines, Iowa. Improvements include installing approximately 37,656 lineal feet of 2” conduit in a duct bank orientation, installing 18,828 lineal feet of 6-way multi-duct conduit in duct bank orientation, installing 18,821 lineal feet of 7-way multi-duct conduit in duct bank orientation, installing approximately 7,132 lineal feet of 7-way multi-duct conduit in a stand-alone orientation, installation of pull boxes and vaults, installation of tracer wire, racking systems, clearing and grubbing, erosion control, traffic control and other associated improvements necessary to complete the project.