Specifications include, but are not limited to: furnishing of all labor, equipment, and materials for the construction of improvements generally described as follows: The Fiber Conduit Inter-connect project (Green Route) includes installation of a multi-duct conduit pathway, structures and surface restoration along the S. 60th Street, Adams Street, S. 50th Street, Maffitt Lake Road, SE 35th Street, Iowa Highway 5 and SE Soteria Avenue corridors in the City of West Des Moines, Iowa. Improvements include horizontal directional drilling approximately 31,782 lineal feet of multi-duct conduit, installation of pull boxes and vaults, installation of tracer wire, racking systems, erosion control, traffic control and other associated improvements necessary to complete the project. The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project.