Specifications include, but are not limited to: Sidewalk, PCC, 4” This item shall include all labor, materials and equipment necessary to construct 4-inch thick sidewalk in accordance with SUDAS Specifications Section 7030 and these special provisions. This item shall include all normal work associated with constructing sidewalk and seeding all disturbed areas in the boulevard and property side of the walk with grass seed. The area to be seeded shall be graded flush with the top of curb and sidewalk and shall be free from stones, debris and broken concrete. Backfill material shall consist of topsoil and shall be suitably compacted to prevent settlement. –Removal of Sidewalk Item shall include all labor, materials and equipment necessary to remove sidewalk, steps or pedestrian curb ramps in accordance with SUDAS Specifications Section 7030 and these special provisions.