Specifications include, but are not limited to: The work includes the furnishing of all labor, materials, equipment and services necessary for the construction of Fill and Support of a Subsurface Vault that needs to be coordinated with a streetscape improvement along the south side of the 100 Block of East 3rd Street. The work shall include removing all debris from the portion of the basement under the sidewalk, installing concrete masonry unit (CMU) walls and filling the space with controlled low strength material (CLSM). Also, reinforce the existing concrete beam in the mechanical room as shown on plans. This work shall be coordinated with a streetscape project to include openings in the sidewalk for planters, light pole installations, etc. The quantities shown on the plan sheet S1.1 represent the Project Engineer’s estimate of the amount of work to be completed. Actual as-built quantities may vary from bid quantities.