Specifications include, but are not limited to: The extent of work on this project includes all materials, equipment, transportation, and labor necessary to complete the improvements generally described as follows: Construction including grading, roadway paving, water main installation, street lighting, driveway construction, sidewalk and trail construction, storm sewer installation, sanitary sewer installation and surface restoration along East Iowa Ave from North 15thStreet west approximately one quarter mile. The project includes approximately 5,390 SY of 8” PCC, 1,510 SY of shared use path and 1,720 SY of sidewalk, 670 LF of 15” – 30” RCP storm sewer, 1,200 LF of 12” PVC water main, 387 LF of 8” sanitary sewer, culvert removal, driveway construction, erosion control, and miscellaneous associated work, including cleanup.