Specifications include, but are not limited to: 1. Provide one 2-inch diameter HDPE, SDR 13.5 duct as noted on plans (approximately 5340’) 2. It shall be the sole responsibility of the contractor to ensure that the fiber installation is in the public Right-of-Way. See engineering plans for locations and distances off existing public ROW when provided. 3. Bore at depths called out on the plans for clearance under waterways, paved roads, future grading, and future culverts. 4. The contractor shall use a clamp-on, crimp-on, or compression type duct coupler for all duct splices. The coupler will be of a type specifically designed for telecommunications duct. The contractor will be required to provide ICN a 24 hr notice for splice inspection and recording the GPS location prior to backfill (unless other arrangements have been made). 5. Ensure that a pull rope (Mule Tape) is left in all duct.