Specifications include, but are not limited to: A. Excavations: All excess soils from the project site must be disposed of in the State of Iowa. B. Basements and Foundations: Completely remove and dispose of all basement walls to 4 feet below existing grades unless otherwise specified in the contract documents as having other deconstruction limits. Basement floor slab shall be fractured to allow water drainage, to the satisfaction of the Jurisdictional Representative. Notify Jurisdictional Representative 48 hours prior to basement or foundation work. The Jurisdiction shall inspect work site prior to any backfilling of the excavated work. C. Surface Slabs: Excavate and remove all concrete, asphalt, or masonry slabs and appurtenances. using a licensed company. Excavated and remove septic tanks and dispose of properly. Jurisdiction shall be responsible for pumping septic storage tanks before removal. pits. Abandon as indicated on the applicable drawings. D. Miscellaneous Objects: Remove all clotheslines, signs, fences, piping, posts, light posts and their foundations or any other objects protruding from the ground and fill any resulting hole A. Backfill: Place backfill material in all excavation areas and holes with material meeting Section 2010, 2.03. Unless otherwise specified in the contract documents, compact using Type A compaction as indicated in Section 2010, 3.04. If compaction with moisture and density control is specified, use Section 2010, 3.09. Notify the Jurisdictional Representative 24 hours in advance. B. Borrow: If sufficient fill material is not available, supply additional material of equal quality to the soil on the site. Supply suitable material meeting Section 2010. No payment will be made for supplying additional fill material. C. Grading: Grade site to conform with all surrounding areas with a uniform surface that will not allow ponding and does not change drainage patterns that existed prior to demolition. Remove excess excavation material from the site. D. Seeding: Complete seedbed preparation, seeding, fertilizing, and mulching of the site according to the requirements for permanent urban seeding in Section 9010, 2.02, A. If unable to comply with permanent seeding dates, apply the urban temporary erosion control mixture in Section 9010, 2.02, D.