Loading...
Skip to main content
< Back to results

BBHH HUD Resiliency Program


Location
Iowa
Publication Date
03/16/2020 08:02 AM EDT
Closing Date
03/27/2020 02:00 PM EDT
Issuing Organization
City of Dubuque
Solicitation Number
Description

Specifications include, but are not limited to: Basement: Remove paneling from the walls and dispose. Remove any framing that is water damaged and dispose; Remove loose parge coating and mortar. Tuck point all walls as needed; Install a 30-inch-deep by sump jar with an airtight seal, with drain and viewing window. Install in the low spot of the basement. Over dig the jar hole by about 6 inches all the way around the new sumps. Fill the area around the sump jar and around the tile with clean gravel. Drill ½ holes in the sump jar to allow water in. Start the holes about 15 inches above the bottom; Main Floor: Install one Kidde Carbon Monoxide alarm with a 10-year sealed battery C3010, or equal. Install in the lowest habitable level, finished room, about four feet above the floor in an open location. Secure detector to wall with manufacturer supplied bracket in accordance with manufacturer’s instructions. If you need location clarification, ask for guidance. This detector is not hardwired.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids