Specifications include, but are not limited to: Portland Cement Concrete (PCC) Patching at various locations including approximately 1,816 SY of reinforced 7” PCC full depth patching, 723 SY of reinforced 8” PCC full depth patching, 5,430 SY of reinforced 9” PCC full depth patching, 58 SY of reinforced 7” PCC full depth patching (IA DOT 5 Hr. PCC Mix), 167 SY of reinforced 8” PCC full depth patching (IA DOT 5 Hr. PCC Mix), 192 SY of reinforced 9” PCC full depth patching (IA DOT 5 Hr. PCC Mix), 100 SY of reinforced 10” PCC full depth patching (IA DOT 5 Hr. PCC Mix), 46 SY of reinforced 14” PCC full depth patching (IA DOT 5 Hr. PCC Mix), 100 SF of PCC Partial depth patching, 13,941 LF of joint preventative sealant, PCC curb and gutter replacement, median repair, intake reconstruction, manhole adjustments, drives, sidewalks, traffic control, traffic loops, and other miscellaneous work to complete the project.