Specifications include, but are not limited to: 2019 Asphalt Overlay Ramp Project Three. Replacement of twenty-eight (28) corner access ramps in conjunction with the Public Works Asphalt Overlay program at the following locations: 23a. Pinard Street and 29th Street, Northwest corner, single ramp, perpendicular to 29th Street 23b. Pinard Street and 29th Street, Southwest corner, single ramp, perpendicular to 29th Street 24a. Pinard Street and 28th Street, Northwest corner, single ramp, perpendicular to 28th Street 24b. Pinard Street and 28th Street, Northeast corner, single ramp, perpendicular to 28th Street 24c. Pinard Street and 28th Street, Southwest corner, dual ramp, perpendicular to both streets 24d. Pinard Street and 28th Street, Southeast corner, dual ramp, perpendicular to both streets.