This project consists of, but not limited to, the purchase and installation of a new stair lighting system on the main floor of Stephens Auditorium in Ames, Iowa. SELECTIVE DEMOLITION FOR ELECTRICAL PART 3 EXECUTION 1.01 EXAMINATION A. Verify that abandoned wiring and equipment serve only abandoned facilities. B. Beginning of demolition means installer accepts existing conditions. 1.02 PREPARATION A. Disconnect electrical systems in walls, floors, and ceilings to be removed. B. Coordinate utility service outages with utility company. C. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations.