The Project will involve the following: Rehabilitation of the Rundell Street Pumping Station, which is a stormwater pumping station. The pumping station is comprised of one wet well that contains two submersible pumps and a separate wet well that contains two axial flow propeller pumps. The two wet wells are connected via a 54- inch gravity sewer. The submersible pumping station work consists of the replacement of two submersible pumps and appurtenances, check valves, isolation valves, and electrical equipment; replacement of the existing 14-foot by 14-foot concrete top slab and access doors; preparation and painting of the existing trash screens anchors and supports. The propeller pumping station work consists of installation of concrete curbing and an equipment pad for the new City provided control panel and replacement of the solenoids in the oil reservoir enclosure. Additionally, work includes replacement of curb ramps at all four corners of the Rundell Street and Center Avenue intersection, installation of a utility meter cabinet, miscellaneous restoration. The project is located in the 700 block of Rundell Street, Iowa City, Iowa 52240.