Preparatory Tasks & Responsibilities: 1. Secure all necessary locates from “Iowa One Call.” 2. Construction signing shall comply with the Manual on Uniform Traffic Control Devices. 3. The contractor must notify the local IDOT maintenance garage/County/City (per permit) of intent to proceed at least 48 hours prior to commencement of work. 4. ANSI/ISEA 107-2004 CLASS 2 SAFETY VESTS are required at all times within Iowa Department of Transportation right-of-way 5. Exceptions/Additions to Standard Installation Requirements: none Duct Installation 1. Provide 1.25-inch HDPE, SDR 13.5 duct from Station 222+00 to Station 3102+20 2. It shall be the sole responsibility of the contractor to ensure that the fiber installation is in the public Right-ofWay 3. See engineering plans for locations and distances off existing public ROW when provided. 4. Ensure that a pull rope (Mule Tape) is left in all duct. Handholes: See Engineering plans for exact locations of a total of 2 handholes Fiber Installation 1. Install a 970-foot± Contractor-provided, armored single mode OSP fiber cable from Station 222+00 to Station 3102+20 2. Route cable through conduit and into handholes 3. Coil excess cable evenly in each handhole, ensure a minimum of 100 feet of cable in both handhole Locate Facilities 1. Station 3102+20 – (East/North) end will be a locate facility 2. Station 222+00 - (West/South) non-locate point - install warning marker