Specifications include, but are not limited to: This bid furnishes the replacement control system for the "River In" PLC. Additionally, the replacement system will monitor and control the closed-loop cooling system. Due to the critical nature of the closed-loop cooling water system, the new control system shall be separated into two (2) totally independent PLCs. Each PLC shall control portions of the new river water and closed-loop cooling systems. To support operations and construction, a portion of the existing river water system equipment will be transferred to the new control system to support simultaneous operation of the existing and new closed-loop cooling system. After startup, the remaining portions of the existing river water system will be transferred to the new control system. Factory acceptance testing shall occur on site at the University of Iowa Power Plant. Supplier shall provide a simulator as a means of testing the control logic and the graphical interface Human Machine Interface (HMI) screens. During the acceptance test, the simulator shall be used to cycle through normal fail-over operations. Furnish field services including training University staff as defined within the individual technical specification sections