0010 2101-0850001 CLEARING AND GRUBBING ACRE 21.300 _________._____ _________._____ 0020 2102-0425070 SPECIAL BACKFILL TON 11,201.600 _________._____ _________._____ 0030 2102-2710070 EXCAVATION, CLASS 10, ROADWAY AND BORROW CY 48,097.000 _________._____ _________._____ 0040 2102-2710090 EXCAVATION, CLASS 10, WASTE CY 37,380.000 _________._____ _________._____ 0050 2102-2712015 EXCAVATION, CLASS 12, BOULDERS OR ROCK FRAGMENTS CY 50.000 _________._____ _________._____ 0060 2105-8425015 TOPSOIL, STRIP, SALVAGE AND SPREAD CY 22,984.000 _________._____ _________._____ 0070 2105-8425020 TOPSOIL, STRIP AND STOCKPILE CY 7,402.000 _________._____ _________._____ 0080 2107-0875100 COMPACTION WITH MOISTURE CONTROL CY 37,846.000 _________._____ _________._____ 0090 2107-3825025 GRANULAR MATERIAL FOR BLANKET AND SUBDRAIN CY 300.000 _________._____ _________._____ 0100 2111-8174100 GRANULAR SUBBASE SY 16,745.400 _________._____ _________._____ 0110 2113-0001100 SUBGRADE STABILIZATION MATERIAL, POLYMER GRID SY 51,682.100 _________._____ _________._____ 0120 2115-0100000 MODIFIED SUBBASE CY 19,223.400