1 2010-108-F-0 Below Grade Excavation (Core Out) by TON 220.00 TON 2 2010-108-J-0 Subbase, Modified Subbase - Gr 14 (Modified Subbase Pile) 225.00 TON 0 0 0.00 0 Sub Total 0 Division 3010 - Trench Excavation and Backfill 0.00 0 3 3010-108-A-4 Class I, Bedding Material, 1" Commercial Clean Stone 150.00 TON 4 3010-108-C-0 Trench Foundation - 3" Breaker Run, (Modified Macadam Pile) 220.00 TON 5 3010-108-D-0 Replacement of Unsuitable Backfill Material, Gr 30, (Modified Subbase Pile) 950.00 TON 6 3010-108-F-0 Trench Compaction Testing 1.00 LS 0 0 0.00 0 Sub Total 0 Division 4010 - Sanitary Sewers 0.00 0 7 4010-108-A-1 Sanitary Sewer Gravity Main, Trenched, 6" PVC C900 65.00 LF 8 4010-108-A-1 Sanitary Sewer Gravity Main, Trenched, 8" PVC C900 186.00 LF 9 4010-108-I-1 Double Sweep Cleanout 2.00 EA 10 4010-108-L-0 Sanitary Sewer Abandonment, Fill and Plug 2.30 CY