Interior - Lead 1.1 See Item #13 - Attributes for Electrical Requirements - All items to be included must be listed*** 1.2 Basement, Room 1, To Room 3 Door Casing/Header, Jamb, Stop, Threshold, Door (C) – Abatement – Remove and replace Door Components. 1.3 Basement, Room 1, Coal Door Frame, Coal Door (B) – Interim – Paint Stabilization followed by two coats of high-quality interior paint. 1.4 Basement, Room 1, Cabinet Frame, Shelf Support, Shelf (A/C/D) – Abatement/Interim – Remove and replace Shelves. Paint Stabilization of Frame and Shelf Support followed by two coats of high-quality interior paint. 1.5 Basement, Room 2, Wall (C/D) – Interim – Paint Stabilization followed by two coats of high-quality interior paint. 1.6 Basement, Room 2, Window Frame and Sash (# 33) – Abatement – Remove and replace Window Components with vinyl replacement. (New Window x1) 1.7 Basement, Room 2, To Room 3 Door Frame, Stop, Door (D) – Abatement – Remove and replace Door Components.