0010 2105-8425005 TOPSOIL, FURNISH AND SPREAD CY 1.000 _________._____ _________._____ 0020 2212-5070310 PATCHES, FULL-DEPTH REPAIR SY 155.300 _________._____ _________._____ 0030 2212-5070330 PATCHES BY COUNT (REPAIR) EACH 5.000 _________._____ _________._____ 0040 2214-5145150 PAVEMENT SCARIFICATION, NOMINAL THICKNESS SY 12,518.200 _________._____ _________._____ 0050 2303-1032500 HOT MIX ASPHALT STANDARD TRAFFIC, INTERMEDIATE COURSE, 1/2 IN. MIX TON 1,383.500 _________._____ _________._____ 0060 2303-1033504 HOT MIX ASPHALT STANDARD TRAFFIC, SURFACE COURSE, 1/2 IN. MIX, FRICTION L-4 TON 1,040.100 _________._____ _________._____ 0070 2303-1258283 ASPHALT BINDER, PG 58-28S, STANDARD TRAFFIC TON 145.400 _________._____ _________._____ 0080 2303-6911000 HOT MIX ASPHALT PAVEMENT SAMPLES LUMP SUM LUMP SUM _________._____ 0090 2435-0600010 MANHOLE ADJUSTMENT, MINOR EACH 2.000 _________._____ _________._____ 0100 2511-6745900 REMOVAL OF SIDEWALK SY 47.800 _________._____ _________._____ 0110 2511-7526004 SIDEWALK, P.C. CONCRETE, 4 IN. SY 37.300 _________._____ _________._____