Construction of 2400 feet of EP True Parkway from Future Bridgewood Boulevard to Wendover Lane including 15 acres of Clearing and Grubbing, 15,069 CY of Topsoil Strip, Salvage and Spread, 50,371 CY of Excavation. 3,606 LF of Storm Sewer and 31 Storm Sewer Structures. 780 LF of Subdrain and Subdrain Outlets. 17,840 LF of Conduit and Vaults. 2,585 LF of Water Main, Fittings, Valves and Hydrants. 11,266 SY of 8 inch Reinforced PCC Pavement, 253 LF of 6 inch PCC Pavement and 2,733 SY of 6 inch Reinforced PCC Shared Use Path. 176 LF of Twin 8 Foot x 8 Foot Reinforced Concrete Box Culvert and Headwalls. Erosion Control, Seeding and Surface Restoration, Pavement Markings, Construction Survey, and other Miscellaneous Construction.