Construction Manager (DCI Group) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of the replacement of existing membrane roofs on the Dack and Malloy Buildings at the Iowa Veterans Home in Marshalltown, IA. Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All the design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 Scope includes, but is not necessarily limited to: 1.3.5.1 Project includes the complete design and construction administration for the replacement of approximately 60,000 SF of roofs at the Malloy Building and approximately 20,000 SF of roofs at the Dack Building. 1.3.5.2 Existing roofs are rock ballasted. It is anticipated that new design will include a fully adhered EPDM membrane in lieu of ballast. 1.3.5.3 During previous investigation it was determined that a previous project added a layer of coverboard/insulation, EPDM, and ballast on top of the existing EPDM system and ballast. 1.3.5.4 Design shall include roof top protective walking pads for access to rooftop equipment. 1.3.5.5 Design shall include temporary measures and adjustments to roof top equipment and pathways and curbs as necessary to achieve proper roof design, details, and drainage. 1.3.5.6 Design shall include fall protection where access to roof top equipment or to adjacent spaces would be required to meet OSHA guidelines. 1.3.5.7 Where equipment has been previously abandoned, design shall include removal and infill of structure and roof. 1.3.5.8 See Attachment A & B for additional details. 1.3.6 Existing CAD/PDF drawings will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm. 1.3.7 Field examination of the existing buildings. 1.3.8 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include nonproprietary equipment and systems. 1.3.9 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal.