The Airport requires the installation of new signage and wayfinding systems to meet a newly developed design standard for the Terminal and surrounding facilities. This includes upgrading existing signage throughout the Airport Campus, such as the terminal, concourses, CONRAC, central terminal area, and perimeter roadways. The project will involve replacing directional signs and updating gate signage. Interior Signage: • Directional Signage Replacement: The contractor will remove and replace all existing directional signage within the terminal with new signage according to the bid documents, ensuring clear and legible wayfinding. • New Sign Locations: New directional signs will be fabricated and installed in designated locations within the terminal, coordinated with the Airport’s project team for proper placement. • Message Updates: All existing signage messages will be updated to reflect current operational needs and comply with the new design standard...