Specifications include, but are not limited to: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting, and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 At a minimum, design for construction for the following: 1.3.5.1 It is anticipated to remove the current Digital Master Control and replace with a Digital Mater Control 8000. 1.3.5.2 Design and construction administration for the complete replacement of the control system for the main switchgear for the Newton Correctional Facility. This switchgear controls the power from two feeds from Alliant Energy and two existing Cummins generators serving the Newton Correctional Facility. The existing controller has exceeded its expected useful life and replacement parts are no longer available. Contractor must maintain power throughout the project by providing an adequately sized standby generator. 1.3.6 Existing CAD/PDF drawings will be provided to the successful design firm if available. Accuracy of drawings shall be verified by the design firm. 1.3.7 Field examination of the existing buildings. 1.3.8 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems. 1.3.9 Designer shall include any and all survey work required for completion of project. 1.3.10 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required. 1.3.11 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.12 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.13 Quality control during Design, Preconstruction and Construction. 1.3.14 Compliance with all Federal, State, and applicable Local codes. 1.3.15 Completion of State building and energy code documents, as required. 1.3.16 Design review will be conducted at 50% construction documents, and 95% construction documents. Review will be conducted with DAS Owner Representative, Construction Manager, and Facility Representative, at a minimum. Drawings, specifications and cost opinions (if applicable) shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions. 1.3.17 Review with the State Fire Marshal’s office for approval of plans or exemption from review. All fees associated with the State Fire Marshal’s office are the responsibility of the designer. 1.3.18 Develop and distribute agendas and meeting minutes for all meetings during the design phase. Model Serial # Year of Installation Generator 1 500DFED G960612267 1995 Generator 2 500DFED G960612268 1995 DMC Panel PCIL 2002G/48A H960612921 1997 1.3.19 Designer shall provide any information necessary to obtain utility rebates where applicable. 1.3.20 Construction cost opinions provided by the Design Professional team during Design at 50% construction documents, and 95% construction documents with a Final Estimate for construction included with bid documents, per Iowa Code.