Construction Manager (McGough Construction) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of replacing the existing diesel tanks with new tanks with properspill containment at the Mt. Pleasant Correctional Facility. Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner’s maintenance staff. 1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 The following design services will be needed: 1.3.5.1 Preparation of construction drawings and specifications that detail the appropriate spill-containment measures for exterior, above-ground diesel tanks. The drawings should reflect the replacement of the four existing singlewalled tanks with two 25,000-gallon double-walled tanks, along with all necessary spill-containment features. The existing tanks supply three boilers and a generator. 1.3.5.2 Development of drawings showing the routing and reconnection of the new tanks to the existing fuel lines. 1.3.6 Field examination of the existing buildings. 1.3.7 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include nonproprietary equipment and systems. 1.3.8 Designer shall include any and all survey work required for completion of project. 1.3.9 Coordinate with State agenciesto confirm utilitiesthat may be abandoned as well asshut down requirements where required. 1.3.10 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.11 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.12 Quality control during Design, Preconstruction and Construction. 1.3.13 Compliance with all Federal, State, and applicable AHJ codes. 1.3.14 Completion of State building and energy code documents, asrequired.