Cal883301A In general, the work includes constructing a wetland that receives water from an existing tile using a pump powered using solar panels. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, county road and culvert removal and replacement, riprap placement, and seeding. This project includes around 15,752 total cubic yards of earthwork, 1,217 linear feet of various tile installation, 158 square yards of PCC pavement replacement, 390 tons of riprap along with 29 tons of Class A Roadsone, 500 linear feet of silt fence, and 14.1 acres of seeding. The project also includes installation of one pump systems with the associated solar panels and controls. The estimated construction cost range for this project is $300,000 to $400,000. Cal883220A In general, the work includes constructing a wetland that receives water from an existing drainage ditch using a pump powered using solar panels. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tied concrete block mat and riprap placement, and seeding. This project includes around 1,775 total cubic yards of earthwork, 172 linear feet of various tile installation, 2200 square feet of tied concrete block mat, two concrete structures, 218 tons of riprap, and 14 acres of seeding. The project also includes installation of one pump systems with the associated solar panels and controls. The estimated construction cost range for this project is $200,000 to $260,000.