0010 2104-2710020 EXCAVATION, CLASS 10, CHANNEL CY 865.000 _________._____ _________._____ 0020 2401-6745625 REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____ 0030 2402-2720000 EXCAVATION, CLASS 20 CY 164.100 _________._____ _________._____ 0040 2403-0100010 STRUCTURAL CONCRETE (BRIDGE) CY 354.500 _________._____ _________._____ 0050 2403-1000005 FIBER REINFORCEMENT FOR STRUCTURAL CONCRETE CY 253.700 _________._____ _________._____ 0060 2403-1000010 TRIAL BATCH AND TEST PLACEMENT (FIBER REINFORCED CONCRETE) LUMP SUM LUMP SUM _________._____ 0070 2404-7775000 REINFORCING STEEL LB 7,004.000 _________._____ _________._____ 0080 2404-7775005 REINFORCING STEEL, EPOXY COATED LB 83,264.000 _________._____ _________._____ 0090 2404-7775009 REINFORCING STEEL, STAINLESS STEEL LB 3,347.000 _________._____ _________._____ 0100 2407-0562830 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB30 EACH 10.000 _________._____ _________._____ 0110 2407-0562890 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB90 EACH 5.000 _________._____ _________._____ 0120 2408-7800000 STRUCTURAL STEEL LB 5,930.000