0010 2104-2710020 EXCAVATION, CLASS 10, CHANNEL CY 818.000 _________._____ _________._____ 0020 2301-0685550 BRIDGE APPROACH PAVEMENT, AS PER PLAN SY 309.000 _________._____ _________._____ 0030 2401-6745625 REMOVAL OF EXISTING BRIDGE LUMP SUM LUMP SUM _________._____ 0040 2402-2720000 EXCAVATION, CLASS 20 CY 228.200 _________._____ _________._____ 0050 2403-0100010 STRUCTURAL CONCRETE (BRIDGE) CY 714.200 _________._____ _________._____ 0060 2403-1000005 FIBER REINFORCEMENT FOR STRUCTURAL CONCRETE CY 422.200 _________._____ _________._____ 0070 2403-1000010 TRIAL BATCH AND TEST PLACEMENT (FIBER REINFORCED CONCRETE) LUMP SUM LUMP SUM _________._____ 0080 2404-7775000 REINFORCING STEEL LB 54,180.000 _________._____ _________._____ 0090 2404-7775005 REINFORCING STEEL, EPOXY COATED LB 136,431.000 _________._____ _________._____ 0100 2404-7775009 REINFORCING STEEL, STAINLESS STEEL LB 5,340.000 _________._____ _________._____ 0110 2407-0562865 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB65 EACH 6.000 _________._____ _________._____