1. Mobilize and demobilize labor, equipment, and materials, as needed. 2. Furnish, deliver, store, and apply liquid aluminum sulfate and liquid sodium aluminate to Lake of Three Fires and Green Valley and Prairie Rose Lakes’ sedimentation basins. 3. Maintain and protect boat launches or other land areas used for access to lake and areas used for staging and storage of equipment and materials. 4. Utilize dedicated site access for equipment used in chemical application from staging/storage area to water surface. 5. Furnish, install, and remove all appropriate signage and buoys (if used) in a timely manner. 6. Furnish, install, and remove all appropriate traffic and pedestrian control devices needed for site access and staging. 7. Restore all land areas directly or indirectly disturbed by the Work.