Specifications include, but are not limited to: Construction of a new electrical vault building and providing new electrical systems within the vault. New Constant Current Regulators to power the seven (7) airfield circuits inside the vault, and a new back-up generator for the airfield circuits outside the vault will be provided as well. Demolition of the existing vault is also included as part of this project. The runway edge lights on both runways will be replaced with LED edge lights. New #8 AWG power cable will be installed for the entire length of both runway circuits. Electrical duct bank installation will also be required to relay the home-run cables from the new vault building to each of the respective runway and taxiway circuits. The airport’s primary wind cone and rotating beacon will also be replaced. There is a bid alternate to install Runway End Indicator Lights (REILs) for Runway 18.