The work generally consists of the following: Replacement of PCC pavement in 8th Avenue West from South M Street to the west dead end and addition of sidewalk on each side of street: work includes but is not limited to 1,215 SY of PCC pavement, 256 SY of PCC driveways, 255 SY of PCC sidewalk, surfacing removals, subgrade preparation, subbase, site clean up, and surface restoration. 1 2010-E Excavation, Class 10 CY 367 $ $ 2 2010-G Subgrade Preparation SY 1,396 $ $ 3 2010-J Subbase, Granular SY 1,396 $ $ 4 2010-M Compaction Testing LS XXX $ $ 5 6010-E-1 Manhole Adjustment, Minor EA 1 $ $ 6 7010-A Pavement, PCC, 7" Thick SY 1,215 $ $ 7 7010-I PCC Pavement Samples and Testing LS XXX $ $ 8 7030-A-3 Removal of Driveway SY 236 $ $ 9 7030-E Sidewalk, PCC, 4" Thick SY 248 $ $ 10 7030-E Sidewalk, PCC, 6" Thick SY 7 $