The 18TH Street SE Drainage Repair Project will consist of repairs along 18th Street SE in Le Mars, IA. The work includes new curb and gutter, roadway paving removal and replacement, storm sewer removal and replacement, storm sewer structure removal and replacement, seeding, grading, and traffic control. DIVISION 2 - EARTHWORK 2.01 2010-E TOPSOIL, REMOVE AND REPLACE ONSITE CY 75 2.02 2010-E EXCAVATION, CLASS 10 (INCLUDES IMPORTED FILL) CY 50 2.03 2010-G REMOVE & REPLACE SUBGRADE, 24" SY 260 DIVISION 4 - SEWERS AND DRAINS 4.01 4020-A-1 STORM SEWER, TRENCHED, RCP, 15" LF 47 4.02 4020-A-1 STORM SEWER, TRENCHED, RCP, 18" LF 150 4.03 4020-A-1 STORM SEWER, TRENCHED, RCP, 24" LF 31 4.04 4020-E CONNECTION TO EXISTING STORM SEWER EA 4 DIVISION 5 - STRUCTURES FOR SANITARY AND STORM SEWERS 6.01 6010-A-2 STORM MANHOLE, SW-401, 72" EA 1 6.02 6010-B-1 STORM INTAKE, SW-506 EA 1 6.03 6010-B-1 STORM INTAKE, SW-507 EA 2 6.04 6010-B-1 STORM INTAKE, SW-512, 24", TYPE 3 CASTING EA 1 6.05 6010-H REMOVE EXISTING STORM STRUCTURE EA 2