Specifications include, but are not limited to: This project consists of the furnishing of all equipment, labor and materials for the construction of approximately 1,575 linear feet of 8-inch PC 350 ductile iron water main. The work includes maintenance of traffic; tree removal; excavation; installation of water main, gate valves, fittings, fire hydrants and water services; backfilling; removal of abandoned fire hydrants; full-depth milling of existing asphalt pavement; removal of sections of unsuitable existing base and replacement with geogrid and new aggregate base, as authorized by the Engineer; removal and replacement of sections of sidewalk, curb and gutter, curb ramps and driveway aprons, as authorized by the Engineer; asphalt paving; tree replacement; topsoil and sod restoration; and all other related work and appurtenances.