Specifications include, but are not limited to: Routine 24 Month Frequency (176 Bridges) - Bridge 158 is closed to vehicular traffic, therefore not eligible under NBIS however the LPA wishes to have inspected and keep in inventory (100% Local Funds) - Bridge 183 was a CCMG in 2016 and will be under construction in 2018. BIAS will be updated when open to vehicular traffic. - Bridges 193 and 203 are pedestrian structures which are not eligible under NBIS however the LPA wishes to have inspected and keep in inventory (100% Local Funds) - Hoosier National Forest will be constructing 2 new bridges in 2018. Bridges have not yet been entered into BIAS. 1) County Road 800 North over Starnes Branch 2) County Road 1250 West over Negro Creek Other: Bridge 154, scheduled letting of 10/2021. Initial inspection required in 2022. Underwater 60 Month Frequency - Bridges last inspected in August 2016. Required Inspection in August 2021. Special Inspection 24 Month Frequency - Bridge 154, Fracture Critical Elements with condition Rating of 4 or less. Phase 1A ONLY. With scheduled letting of 10/2021, bridge should be under construction prior to start of Phase 11A.