Specifications include, but are not limited to: INDOT anticipates needing 2 Project Engineers / Project Supervisors and 6 inspectors as work load requires over the course of this contract. The selected firm shall provide personnel local to the project site such that neither commuting nor lodging expenses are incurred. INDOT will control the hours and staffing of these personnel who may be required to work during the winter season, work up to 12 hours per day, and/or work at night. The LOI must specify the names of the PE/PS and inspectors who will be supplying services under this contract. Personnel identified in the LOI who are not full time employees at the time of LOI submittal shall be identified with explanation of employment status. The selected firm shall furnish all construction field testing equipment necessary to sample and test materials in accordance with INDOT procedures.