Specifications include, but are not limited to: Sanitary sewer rehabilitation using the CIPP method for approximately 650 feet of 15-inch sewer; 1,836 feet of 12-inch sewer; 855 feet of 10-inch sewer; and 6,733 feet of 8-inch sewer. Work will also include the complete replacement of deteriorated sections of the sewer lines, to include thirty-five (35) feet of 15-inch pipe, fifty-nine (59) feet of 12-inch pipe, nine (9) feet of 10-inch pipe, and thirty-five (35) feet of 8-inch pipe. Lateral repairs and reconnections should be completed in pipe segments that are being replaced. NOTE: There is a hard copy and a thumb drive at the Town Hall. The Thumb drive contains video footage of the sewer line. The files are multi-GIGS large and not transferable over regular mail or FTP. Bidders will be responsible for procuring that thumb drive from the Town.