Specifications include, but are not limited to: Shall submit an underground coal mining plan and bonding information that are in compliance with the requirements of IC 14-34, IC 14-35, and 312 IAC 25 . The underground coal mining plan shall include the location of all surface equipment and procedures for noise and dust abatement. b. Shall take into account, and shall be responsible for repair of all utilities above and below ground if damaged. c. Shall be responsible for all clearances, permitting, zoning changes, variances, and legal concerns as they apply to this property and the underground mining operation. d. Shall obtain the approval of the IDNR for all underground coal mining operations including reclamation of mined and disturbed lands. This does not relieve the Respondent from meeting and complying with all established laws and legal practices concerning mining operations. e. Must detail and justify any need for preliminary testing, drilling, boring, evaluations, and surveys that may impact the surface of the property, including a detailed discussion of all anticipated surface effects. f. Must include proposals for bonus and royalty payments as specified in IC 14-35-1-5. g. Shall be solely liable for any surface impact to the property as a result of the proposed underground coal mining operation and shall also comply with all subsidence control requirements including, but not limited to, 327 IAC IAC 25-4-91 and 327 IAC 25-6-123