The public infrastructure to be constructed may include water treatment plant improvements, raw water main construction, water distribution main replacement, elevated water tank construction and/or modifications, booster station construction, and similar infrastructure (all such infrastructure collectively referred to herein as the "Infrastructure" and the development and construction of the Infrastructure being referred to as the "Project"). The Infrastructure to be constructed will be finalized during a scoping period with the selected development team. The City has multiple facilities that potentially need improvements but have limited funds to do so. The ultimate scope, budget, and type of project(s) will be determined during the scoping period, at which time the City will determine the most feasible and important project(s) to approve for construction. The City, in its sole discretion, may select one team or multiple teams to enter into the scoping period and may “mix and match” responding teams with appropriate projects as determined during the scoping period. As part of the required scoping period deliverables, the selected team(s) must provide constructability analysis, budgets, schedules, and other necessary information for the City to determine a priority list of the potential Projects.