CONSTRUCTION ENGINEERING MOBILZATION AND DEMOBILIZATION CLEARING RIGHT OF WAY STRUCTURES AND OBSTRUC TIONS, REMOVE SID EWALK, REMOVE (ALL TYPES) DRIVEWAY, REMOVE (ALL TYPES) HEADWALL, REMOVE CURB, REMOVE (ALL TYPES) DETEC TOR HOUSING, REMOVE INLET, REMOVE MANHOLE, REMOVE GUARDRAIL, END TREATMENT, REMOVE PIPE, REMOVE PIPE END SEC TION, REMOVE EXCAVATION, COMMON PUMP AROUND STORM WATER MANAG EMENT BUDGET STORMWATER MANAG EMENT IMPLEMENTATION SW QCP PREPARATION SUBGRADE TREATMENT, TYPE II SUBGRADE TREATMENT, TYPE IC GEOGRID, TYPE IB DENSE GRADED SUBBASE COMPAC TED AG GREGATE NO. 53 COMPAC TED AG GREGATE NO. 53 TEMPORARY FOR DRIVEWAYS HMA PATCHING, TYPE C MILLING, ASPHALT, 1 1/2 IN. MILLNG, ASPHALT, 3 1/2 IN. JOINT AD HESIVE, SURFACE JOINT AD HESIVE, IN TERMEDIATE HMA IN TERMEDIATE, TYPE C. OPTION B