Specifications include, but are not limited to: 1. Excavation of construction area extents a. Contractor shall prepare the area within the extents of the building footprint for construction as shown on the plans b. See the attached “Earth Moving” specifications. They apply to this project generally, and specifically for excavating of earth materials and requirements. c. All excavated materials shall be kept onsite in location determined during preconstruction meeting. 2. Construction of disturbed (bare) Areas with Grass Seeding a. Provide sloped areas adjacent to the equipment storage building along with grass plantings as indicated on the plans. Provide grass seeding in all disturbed areas within the construction boundaries of this project. a. See the attached “Turf and Grasses” specifications. They apply to this project generally, and specifically for seeding of grasses and requirements. 3. Construction of a new Post frame Equipment Storage Building