The selected firm shall perform preliminary engineering and plan development services necessary to produce construction contract documents in accordance with the INDOT project development process. The selected firm shall complete Bridge Rehab Report, Bridge Design and Plan Development, Road Design (for MOT), Small Culvert Hydraulic Design and Plan Development, Topographic Survey, Right-of-Way Plan Development (including R/W Engineering, Title Research and Staking, if needed), Environmental Documentation, Hydraulic Analysis Report, Permits Applications, Utility Coordination, Pavement Design, and Construction Phase Services. Other services such as Ecological Surveys, Archeological Investigations, Historical/Architectural Investigation, professional public outreach and marketing services, and Wetland Mitigation, may be included later if these work types become necessary. INDOT will provide the Geotechnical Engineering Services, the Real Estate Services for this project, if needed. The INDOT Project Manager and the Consultant will schedule the Scoping Meeting within two (2) weeks of the Notice of Selection. The selected firm's fee proposal shall be due 45 calendar days after the selection date for his RFP item. The contract may utilize the INDOT eInvoice application.