Specifications include, but are not limited to: Item 1 (maximum 1 page 8.5” x 11” format) 1.Team formation and staff information a.Company team listing (with staff names to be assigned to this project): i.Architects ii.Engineers iii.Any other project team consultants deemed necessary by proposing consultant (list all entities separately) b.The project specific pertinent skill sets, qualifications and experience of the staff assigned to this project 2.Relevant project experience a.Number of similar roof replacement projects completed within the last five years, preferably with team listed in item 1a. above b.Number of projects completed (with name, project type, project costs) with complete team listed in item 1a. above c.Number of Public University projects completed (with name, project type, project costs), preferably in Illinois with team listed in item 1a. above 3.Team project capability and approach a.Provide a statement about the proposed team capability to do this project, referencing the team’s current and planned projects in design and capacity to serve this project b.Provide a statement summarizing the proposed team’s approach to design of this effort, and what would make this approach desirable to Illinois State University Item 2 (maximum 9 pages, 8.5” x 11” format) 1.Team Submittal Summary Information (maximum 9 pages, 8.5” x 11” format) a.Please provide a list of at least 3 (preferably more) projects completed within the last 3 years that are comparable in size and scope to this project that were completed by your key personnel (i.e. Principal, Project Manager, etc.) to be assigned to this project. Please provide the following minimum information on each along with your proposal: i.Project Name ii.Project Address (Street, City, State) iii.Project Client with Contact Reference Name and Phone Number iv.Project Statistics (Project Firm/Team, SF, Construction Cost, Project Personnel) v.Sample presentation materials of each project to clearly illustrate the reference projects vi.Date Projects were Substantially Completed b.Explain your experience with and understanding of Illinois State University and any applicable building codes.