The City of Naperville is accepting sealed bids from qualified vendors to supply labor, equipment, supplies and material associated with the Springbrook Water Reclamation Center South Plant Improvements. The work generally includes construction of wastewater treatment equipment and appurtenances for retrofitting the existing aeration basin into two (2) new RAS fermenters, the construction of four (4) new aeration basins, two (2) new final clarifiers, installation of three (3) new blowers, modifications to existing clarifier distribution structure and clarifier collection structure, and associated electrical / power equipment, construction of emergency power connections and transformer, flow metering, yard piping, electrical, plumbing, structural and instrumentation and controls construction. Contractor shall be required to coordinate with Springbrook WRC staff, Naperville Electric and the City’s designated system integrator.