Specifications include, but are not limited to:Bid Release 2 for this project will be the construction of the new Football Performance Center that will tie into the Existing Irwin Practice Facility, including selective demolition of Irwin Indoor Practice Facility. The Center will be an 112,000 gsf building with three floor levels. The Lower Level will contain a weight room, related offices, player’s entrance lobby, and the connection into the existing Indoor Practice Facility. The First Level will contain player’s areas such as the locker room, lounge, nutrition, equipment room, laundry, sports medicine and hydrotherapy. The Second Level will contain offices, meeting rooms, coaches’ lockers, lounge, and main auditorium. This facility will have a steel structure with a combination of masonry, curtain wall, architectural pre-cast, and metal panel exterior skin. The building will house the Coach's Offices, Position Meeting Rooms, Hydrotherapy/Training Facilities, Locker Room, Weight Room and Grand Lobby.