Amendment 0001 includes an extension to the offer due date, modification of the SSP (changes can be found in yellow), inclusion of Appendix D, deletion of FAR clauses 5152.211-9000 and 5152.211-9001, modification of FAR clauses 52.252-1, 52.211-10, 52.228-1, addition of FAR clauses 52.217-5, 52.217-7, and 252.219-7003, an update to the wage rates, modification to a page in PLAN_SET_SOL-2022-06-06-L21_22_KEV_CONC_REPAIR, and uploading compressed versions of a Plan Set and a Reference Images File, which were previously unable to be uploaded, to SAM.gov
___________________________________________________________________________
Two documents for this solicitation are too large to upload to SAM.gov. Please email the Contract Specialist, Bradley J. Grothus, at -bradley.j.grothus@usace.army.mil to request access to these files:
- A22.IMG_PHOTO-2022-02-14-L21_REF_IMAGES
- A22.PLAN_SET_REF-2021-10-15-LOCK_21
___________________________________________________________________________
Base bid – Lock No. 21 includes Mobilization and Demobilization, Replace Traveling Kevel Rail, Remove Existing Checkposts, Replace Existing Checkposts, Horizontal Resurfacing, Walkway Installation, Sidewalk, Electrical Work, Remove and Reinstall Appurtenances, Survey Monument Installation and Alignment Survey, and Grading Behind Downstream Guidewall.
Base bid – Lock No. 22 includes Mobilization and Demobilization, Replace Traveling Kevel Rail, Replace Existing Checkposts, Horizontal Resurfacing, Sidewalk, Electrical Work, Remove and Reinstall Appurtenances, and Survey Monument Installation and Alignment Survey.
Option A – Lock No. 21 – Lock Chamber Horizontal Resurfacing includes Mobilization and Demobilization and Horizontal Resurfacing.
Option B – Lock No. 21 – Lock Chamber Vertical Joint Repairs – Land Wall includes Mobilization and Demobilization and Vertical Joint Repairs.
Option C – Lock No. 21 – Lock Chamber Vertical Joint Repairs – Intermediate Wall includes Mobilization and Demobilization and Vertical Joint Repairs.