Specifications include, but are not limited to: Install new Board supplied air conditioning units using new panel and air conditioning bracket, including: ●Coordinate delivery of A/C units with Board authorized representative and other vendors; ●Secure and distribute A/C units as necessary throughout each site; ●Un-package and dispose of new air conditioner packing material; ●Air conditioner package contents to be turned over to school as directed by the Board authorized representative, including any remote controls or directions; ●Removal of existing glass or panel in the locations that will receive new panels; ●Installation of new 1" panel into the existing window top sash and fix the sash in place consistent with included CPS approved detail; ●Installation of new 1/2'' x 3/4" L-angle when needed to adjust the depth of the glazing pocket.